Jim's home | HPV home | This bike's home

Final Geometry and Boom Tube Prep - 1/28/2001

Prev | Next


Laying out frame, cranks and imaginary seat on the floor to figure crank/seat relationship with my 39" x-seam.


The boom tube notched with the 1.25" hole saw. Love that tubing notcher.


Jigged to braze. Will tack first, align by cold setting, then finish brazing.

Prev | Next